2015…In Reverse – Our Amazing Master Closet – Phase I

Yep, that’s right, I’m going to post about 2015…In Reverse.  I’m starting with the last project, our amazing master closet (which technically isn’t done, but may be by the time I do this post) and work backwards, but also try to stay current with new projects in 2016.  Sounds highly unlikely considering my track record.  I’m the worst blogger on the planet!  My downfall is the editing of the pictures.  It takes sooooooo long to edit and watermark them.  If I didn’t have to do that, I could crank these babies out no problem.  Anyway, here we go.  I can’t wait for you to see what we’ve done.  We are so excited to have this project (almost) done.  It’s so nice being organized.

This story starts out at the Habit ReStore, like a lot of my projects do.  We love that place. Let me start off by showing you a picture of our closet before.

2015...In Reverse - Our Amazing Master Closet

Shocking, I know. What happened is, when we moved in, we started out with a million projects…you remember, the fence, the carpet, all the blinds and fans etc? Then we did the shed. So, we just threw stuff in the closet, just to have it out of the way. We knew what was in all the boxes (yeah right!) for the most part, and at least we’d be able to find our clothes.

So this is the plan of our closet. It’s pretty decent size. Not ginormous, but good for us.

2015...In Reverse

I knew what I wanted in the closet, but I couldn’t seem to get it down on paper. We really do fly by the seat of our pants, and sometimes stuff comes to us! Like I said before, we were at the ReStore, I believe it was 11/21/15. We had just started walking around, when I heard my hubby calling me. He’s like, what do you think?

2015...In Reverse

I’m like, Mmmm, what do I think about what? That giant black entertainment unit? As soon as I said those words, I started to formulate a picture in my mind. He (my hubby) was definitely on to something. We looked it over, it was filthy, some of the drawer slides were broken, but the image in my head was amazing and it said take this baby home! All three pieces were $132.00. So we loaded it up and took it home.

So, now it’s Thanksgiving and we have family coming from NY and everything was going to have to wait. Once Thanksgiving was over, and we had fully decorated for Christmas, we were back on it. My hubby put together this temporary closet rod in our Gym (junk room) so that we could get the master closet cleaned out.

temp closet rod

Once this was done, we started emptying out the closet. I vowed that there would never be another cardboard box in my my closet. Lets hope I can keep that. Once it was empty, We tore up the carpet (again), and I took down those awful wire shelves/hanging rods. I had a zillion holes (big holes) to fill and patch and sand. My husband managed to get two coats of Sherwin Williams Anew Grey paint on the walls and I got all the trim painted a beautiful white/white. It was just the gallon of SW paint w/o the color in it.

2015...In Reverse

2015...In Reverse

Now it was time for the floor. I’m so excited about this. It’s going in our entire house, except for the bathrooms, laundry room and mud room. We have over 1600sf of bamboo in boxes all over the house waiting for the day we can install it. It’s going to look amazing.

2015...In Reverse

So this is our beautiful hand scraped bamboo from Lumber Liquidators. We absolutely love it, and they were a breeze to install. Hope the rest of the house goes as smoothly.

So, back to the unit from the Re-Store. We’d been working like dogs on it. All three pieces were 24″ deep and I felt that would take up too much space, so we cut them down to 18″. We used the Kreg Rip-Cut to do the majority of the cutting, but there were parts that we had to use a hand saw, or reciprocating saw. It was a tough job, but much easier thanks to the right tools.

2015...In Reverse

We put braces in the cabinets before cutting, so they wouldn’t fall apart on us.

2015...In Reverse

2015...In Reverse

2015...In Reverse

We had to do the exact same thing to the drawers. Luckily we were able to pull the back panel off the few inches we cut off and re-use it. Just some glue and nails and viola, shorter drawers.

2015...In Reverse

Now came the fun of sanding. There was a lot of sanding to do.

2015...In Reverse

2015...In Reverse

I don’t know what was on those drawer fronts under the ugly pulls, but it was like glue. Oh, wait, did I show you the ugly drawer pulls? You have to see these.

2015...In Reverse

Nice right? So, now it was time to prime. There was a lot to do. We did all the priming with a small 6″ roller and the occasional brush. They were really looking great.

2015...In Reverse

2015...In Reverse

Finally, it was time to paint. I like to use my Critter sprayer. It’s a pretty handy dandy tool. We had to set up a temporary paint booth in our garage so that there wouldn’t be too much over-spray.

2015...In Reverse

Not great, but it worked. Luckily the weather was warm for December and I was able to get everything painted and moved into the house. The pieces were heavy and I needed to get them in the closet to retro-fit them, so I could cut out the baseboard. There was a lot of moving them around.

One of the things I decided to do was to add beadboard to the backs of all three units. I love beadboard. This time I wanted to do something special. I decided to use my Cutting Edge Stencil in the Allover Paisley that I’ve used a million times on the beadboard in a lighter shade of gray than was on the walls.

2015...In Reverse

2015...In Reverse

I absolutely LOVE how this turned out. It’s just a nice subtle touch.

2015...In Reverse

Here they are, finally up on the wall. You can see the ledger board we used to hold them up there while we screwed them all together. This piece was very heavy. We really could have used another set of hands to help get this up there. We got super lucky with the drawer slides. We thought we were going to have to buy all new slides, but my hubby ended up cutting them down and we got new plastic anchors for the back and they totally worked! I was thrilled. That saved us a lot of money.

2015...In Reverse

I wanted to add a little something special to the sides of the drawers…can’t just have plain drawers now can we?!

2015...In Reverse

2015...In Reverse

With painting done on the main pieces, I was thinking about the rest of the closet. This piece was going in the middle of the long wall. We determined that we wanted double hanging on both sides, kind of like his/hers sides. I still wanted a place for long hanging clothes and shoes and we needed a dresser of sorts. The two towers connected to the top part left a big space underneath perfect for a dresser. We needed the storage, because I don’t like dressers in the bedroom, they take up too much room.

Enter this…

2015...In Reverse

Great right? Another successful trip to the Re-Store. There must have been a hotel remodel, there were a lot of these bedside tables. We nabbed three. We measured and determined that three plus a small filler strip on each side would fill the empty space under the main unit. Once we got them home we started right in. We had to cut these down to 18″ also.

2015...In Reverse

Did you notice the drawer slides? Those are the expensive ball-bearing slides. We luckily didn’t have to replace those either…Yay! I primed and painted immediately. Once that was done we connected them together and put on a new back.

2015...In Reverse

2015...In Reverse

2015...In Reverse

2015...In Reverse

I think they look great in this spot! You can see we stained a piece of 1/2″ birch ply for the top. It’s temporary, but I don’t want to spend more money on a top than it cost us to do the entire closet. Granite would cost over $500. Not going to happen. We’ll keep this for a bit and see what we can find. Now, I had to figure out the drawer fronts. I hated what was on them originally, they didn’t fit at all with the vibe of the other pieces. I was going to do a simple 1×2 frame with some beadboard in the middle. My hubby and I started talking about the original fronts. They were solid 3/4″ wood. Too nice to not use, but I hated that half moon. So, we decided to do a little experiment and see if we could re-use them by filling in the half moon with scraps that we had cut off the sides. I told him we’d try one, and if it didn’t look good, back to the original plan. I really wanted to build those fronts. Here’s how it turned out.

2015...In Reverse

2015...In Reverse

2015...In Reverse

2015...In Reverse

2015...In Reverse

2015...In Reverse

Not bad right? My hubby and I just love it. It turned out even better than it did in my mind. I love when that happens. Phase I of the Master Closet project is done. Woo Hoo. Now on to phase II

Until next time…

Signature

Walls and Set Backs

One of my dreams has been to build a house.  We are finally getting to realize that dream. We finally have some walls up. This is not really the way I had planned to do it.  I had always planned to use UBultIt and be my own general contractor or use a custom home builder.  Honestly, I don’t know why we didn’t go those routes.  I’m kinda kicking myself a little.  It would have been hard being my own GC as I do have a day job, so I guess the timing wasn’t right for that option.  Anyway, we went with a commercial builder.  They are pretty close to custom.  You can even move walls or change the facade and pretty much put in any finish you want.  They really have a large selection of lighting, cabinets, flooring, etc.  We didn’t do a lot of expensive upgrades, because we plan to do them ourselves.  I’ll get to blog about them AND I’ll get to stay busy.  Plus, I won’t have to finance for 30 years something that will be outdated in 10. So, this is what happened last Friday the 31st of January.

Bay Window in Eat In Kitchen
This is the bay window in the eat-in kitchen.
Butler's Pantry
This is the butler’s pantry. I wish I had a butler!

Continue reading

My Wish List – for the new house

By now, you all know we (my hubby and I) are building a house. We are so excited. This little rental we are staying in is wicked small and everything we own is in boxes in the two small spare bedrooms. I need to do a post and show you the rental house, but right now, I want to get my wish list down, then I’ll always have it. If you read this post, then you know we are just putting in the basic stuff in the house. I will then start projects to upgrade it like we really want it. I hated upgrading things like faucets etc and then paying for them over 30 years. Keep the mortgage low and upgrade over time – that’s been our motto. So, let’s get started shall we? This is in no particular order, just as I think about them.

I eventually want these cabinets from TheRTAStore.com.

Vintage White, The RTA Store
I want these floors from Lumber Liquadators.

Black Mamba, Lumber Liquadators

 

 

 

 

 

 

 

Is that dark bamboo not yummy? I love it. We put in bamboo in our last house, but really want the hand scraped this time around.

How cool is this little gadget?  It’s a learning thermostat.  It learns your habits and automatically adjusts for you.  It’s also programmable from your phone or tablet – even if you aren’t home.

The Nest, Lowe's

 

 

 

 

 

 

 

I love gadgets. Pretty soon we’ll all live in Jetson houses. How fun would that be? You can pick this little guy up at Lowe’s. I believe it’s around $249

Continue reading